DOSOMAT modernization
Securing the future and increasing efficiency

Modernization keeps your existing DOSOMAT up to date with the latest technology and saves you from having to buy a whole new one. Whether it's a retrofit, control system conversion, or function upgrade, our experts will bring your machine up to the latest standards in technology, ergonomics, and safety.
The result is higher output, improved usability, and extended service life, combining economic efficiency with sustainability.

For individual advice, please contact our service team. +49 7522 986 8600 or

Always up to date

Technology continues to evolve, and your DOSOMAT evolves with it. Targeted upgrades such as new control systems, operating panels, or switch cabinets increase the precision, efficiency, and ease of use of your machine. Modern servo technology ensures maximum accuracy in dosing and movement, while intuitive software interfaces simplify handling and make processes more transparent.

Graphic showing digitized service and maintenance solutions

Modernization extends the service life of your machine, saves resources, and reduces energy consumption. Existing equipment is used intelligently – for efficient and responsible production.

Your advantages at a glance:

  • Improved energy efficiency and control precision
  • Higher productivity with existing mechanics
  • Sustainable use of existing resources
  • Faster restart
  • Lower investment costs

Retrofit or partial modernization – whatever you need

Every machine is different. That's why we offer customized modernization solutions, from replacing individual components to completely renewing the control system. We work with you to determine which components should be replaced or upgraded.

Typical modernization measures:

  • Replacement of control system, operating unit, or electronics
  • Retrofitting of safety devices in accordance with current standards
  • Integration of new systems
Icon for retrofit with device, sheet, and update symbol.

Plannable downtimes

Meeting group plans maintenance and downtime

Modernizations are carried out directly on site. After a technical analysis and preparation, our specialists take care of the entire conversion, including dismantling the old electrical system, installing the new control system, wiring, and commissioning.

Typical project duration:

  • Preparation and design: 6–12 months
  • On-site conversion: 2–3 weeks

This keeps downtime to a minimum and gets your plant back up and running quickly.

The Waldner Service

One contact person for all questions

Only what you really need

Many years of service experience

Maintenance of third-party products